The site was created to centralise decision-making with regard to commercial policy, R&D and the supply chain needs of Grifols’ Bioscience Division, which specialises in plasma protein therapies.
Located in a prime location at the heart of Grange Castle Business Park, it was vital the new facility made an aesthetic statement. Architects, PM Group, were intent on designing a building that would blend into the cloudy hues of the Dublin skyline. Having worked with us before, they chose Optimo and Louvre wall panels* for the external elevations in a mix of blues and greys.
The building was completed with a high-performance QuadCore Topdek Roof Panel, offering excellent resilience and thermal performance.
*The Architectural Wall Panel referenced in this case study has a PIR core. This product is now only available in our high performing insulation core, QuadCore Technology.
The entire project was completed in 15 months thanks to the quick installation programme of the 1 m wall panels and QuadCore Topdek roofing system. These achieved a faster onsite build time in comparison with heavier systems, helping to save time and money during installation and creating a high-quality overall finish.