Skip to main content

Kingspan Insulated Panels

Welcome to Kingspan Insulated Panels

Horizon Unit D8

A new distribution complex is on the horizon

An ambitious new build that aims to provide a modern and bold frontage for an office and warehouse building.

Horizon  Unit D8
Horizon Unit D8

Henderson Park appointed JSA Architects and mac-group to deliver Horizon Unit D8 where the project specified a range of Kingspan Facades, roof, and wall solutions.

Horizon D8 extends to 161,000 ft2 within a site of 8.4 acres. The building includes a two-storey ancillary office space within the logistical warehouse, and the external site contains a service yard, loading docks, and 150 car parking spaces. The building included 14,960 m2 of installed by ACB Group Design & Construct. Almost 6000 m2 of Kingspan and were installed on the walls, whilst formed the substructure of the Vivalda Rainscreen on the office facade of the building. A bold copper frontage is created using around the office area.

For the client, design team and contractor, who designed and built Horizon D8, sustainability was at the heart of the project. The project focused on maximising recycled waste materials found onsite that saved unnecessary and excessive imports, for example, the entire site area was stabilised with cement, which saved 22,400 tonnes of imported quarried stone fill. Our products contributed to the project achieving LEED Gold certification – the QuadCore insulation that featured heavily on the building façade is a low Global Warming Potential solution, and its thermal efficiency and ease of disassembly assisted this accreditation. The crux of our sustainable initiatives is working towards reducing the whole life carbon of our products, lowering embodied and operational carbon to benefit the building owner and the wider community.

The steel framed construction has an extensive front facade in a triangular shape, in which the curtain wall facade is marginally canopied by Evolution panels and framed by the bold copper 0008 shingles, which creates an immediate visual impact. The polyester powder coating on the aluminium shingles gives the appearance of metallic copper, adding texture and tone that contrasts with the grey colour of the rest of the facade. The building façade changes into a three-striped RW cladding to mark the end of the office area and the beginning of the warehouse section of the building.

The Kingspan products were chosen because they were in keeping with the architectural theme of adjacent units, such as the Horizon D9 building which features the classic grey façade. However, the polygon shape of the provides a distinctive aesthetic façade when attached to the Karrier panels. The shingles were also straightforward to install for the Horizon D8 building, as no secondary support solution was needed, only stainless-steel rivets, which also kept costs down for the project. The shingle has a series of return folds on all four sides and interlocks in a consecutive pattern, with the previous shingle hiding the stainless-steel clips of the next one, creating a concealed secret-fix solution which adds to the aesthetic appeal of the frontage.

The polyurethane coating provides a smooth aesthetic, combined with the thermal performance benefits of the QuadCore insulation core. The wall panel colours of Goosewing Grey, Merlin Grey, Umber Grey, and Anthracite XL Forte contrast with the copper shingles to add a sleek modernity to the building. The resilience of the coating is supported by up to 40 years of coating warranty, ensuring the longevity of the product corresponds to its aesthetic benefits.

On the roof of Horizon D8, Kingspan’s were installed, making the construction process easier and safer due to their prefabricated nature. The single-fix panels quickly made the roof wind and water-tight, which lowered the construction risks and enabled internal construction processes to be undertaken at an earlier stage. The roof panels insulate the offices and warehouse, enabling the temperature to be regulated in areas where temperature control is essential. The panels were specified in Goosewing Grey XL Forte.

The products were fitted easily by the experienced construction team, with the panels selected designed to interlock, fix, or hook together with minimal other components or secondary solutions required. The project took just 15 months to construct, including a 16-week COVID shutdown.

Find out more about products used for this project

QuadCore Karrier Wall Panel Product Render
Featured

QuadCore Karrier Wall Panel

An interlocking, high-performance insulated panel that supports the façade

QuadCore KS1000RW Roof Panel

QuadCore KS1000RW Roof Panel

Profiled trapezoidal roof panel powered by high performance insulated core

QuadCore Evolution Recess Wall Panel

Quadcore Evolution Recess Wall Panel

Secret fix insulated wall panel offering an aesthetic modern solution

QuadCore KS1000RW Wall Panel

QuadCore KS1000RW Wall Panel

Designed to integrate with QuadCore KS1000RW Roof Panel

SH Design

SH-Design Cassette

A shingle facade providing a distinctive look

How can we help?

Get in touch today to discuss your needs and discover how we can support you.